Brief of Scope of Work: Laying the cables of electrical, instrument, telecommunication, and fire alarm system as well as the whole cables terminals. The Works was included but not limited the excavation of cable trenches, sand bedding, cable laying, supply and installation of cable tags, cables terminal, cable tiles, warning tape and backing filling and sleeves as per specification and drawings.
Owner
Iraqi Ministry of ElectricityClient
: KEPPT- RAZSub-Project
: Electrical Cables Laying and Terminals WorksLocation
: Iraq-BasraCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of portable water tanks. The Works was included but not limited the construction of concrete foundation, pre-engineered, modularized structures and supplying of plates and steel frames, fabricated and installed of two circle steel portable water tanks with capacity (3100 M3 and 1000 M3) with all attachment look like the spiral ladder, interior supports, sand- blast of steel structure and plates, cutting, welding and painting ……etc., asper specification and drawings.
Owner
KEPPT – RAZ and Iraqi Ministry of ElectricityClient
: CHINA CAMC ENGINEERING COMPANYSub-Project
: Supply, Fabrication and Installation of Steel Portable Water Tanks (Capacity 3100 M3 andLocation
: Iraq-BasraCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of Steel Pipe Racks The Works was included but not limited the pre-engineered modularized structures then supplying of required steel frames and structures, fabricated and installed of pipes racks with all attachment look like the bolts, plates stiffener supports, sand- blast of steel structure and plates, painting ……etc. as per specification and drawings.
Owner
KEPPT – RAZ and Iraqi Ministry of ElectricityClient
: CHINA CAMC ENGINEERING COMPANYSub-Project
: Supply, Supply, Fabrication and Installation Steel Piping RacksLocation
: Iraq-BasraCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of Steel Structure shade with Dia. (100x20)M The Works was included but not limited the whole civil works look like the construction of concrete foundation and floors, pre-engineered, modularized structures and supplying/ erection of Steel Sections, plates anchor bolts, screw, corrugated sheet, sand- blast of steel structure and plates, cutting, welding and painting ……etc., as per specification and drawings.
Owner
KEPPT- RAZ and Iraqi Ministry of ElectricityClient
: HYDRO ELECTRIC POWER SYSTEMSub-Project
: Supply, Fabrication and Installation Steel Work Shop ShadeLocation
: Iraq-Basra- RumailaCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of Steel Structure shade with Dia. (50x20) M The Works was included but not limited the whole civil works look like the construction of concrete foundation and floors, pre-engineered, modularized structures and supplying/ erection of Steel Sections, plates anchor bolts, screw, corrugated sheet, sand- blast of steel structure and plates, cutting, welding and painting ……etc., as per specification and drawings.
Owner
: KEPPT- RAZ and Iraqi Ministry of ElectricityClient
: HYDRO ELECTRIC POWER SYSTEM ENGINEERING COMPANYSub-Project
: Supply, Fabrication and Installation Pumps ShadeLocation
: Iraq-BasraCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of boiler Steel Structure with Height (65) M The Works was included but not limited the pre-engineered, modularized structures and supplying/ erection of the boiler Steel structure sections, plates anchor bolts, screw, sand- blast of steel structure and plates, cutting, welding and painting ……etc., as perspecification and drawings.
Owner
: KEPPT- RAZ and Iraqi Ministry of ElectricityClient
: HYDRO ELECTRIC POWER SYSTEMSub-Project
: Supply, Fabrication and Installation boiler Steel StructureLocation
: Iraq-BasraCONTRACT Time LINE
: 2021Brief of Scope of Work: Supplying, fabricating and installing of Steel Structure High Tension Power Poles The Works was included but not limited the whole civil works look like excavation, backfilling and the construction of concrete foundation, Pre-engineered, modularized structures and supplying/ erection of Steel Sections, plates anchor bolts, Bracing support, sand- blast of steel structure and plates, cutting, welding and painting ……etc., as well as the earthing system as per specification and drawings
Owner
: World Parliament of Security and Peace - Iraqi Ministry of ElectricityClient
: World Parliament of Security and Peace (WPOIQ)Sub-Project
: SSupply, Fabrication and Installation Pumps ShadeLocation
: Iraq-Basra- South AreaCONTRACT Time LINE
: 2019Brief of Scope of Work: Supplying, fabricating and installing of Steel Structure High Tension Power Poles The Works was included but not limited the whole civil works look like excavation, backfilling and the construction of concrete foundation, Pre-engineered, modularized structures and supplying/ erection of Steel Sections, plates anchor bolts, Bracing support, sand- blast of steel structure and plates, cutting, welding and painting ……etc., as well as the earthing system as per specification and drawings
Owner
: kuwait Energy Iraq LimitedClient
: Pertojet Co.Sub-Project
:Location
: Siba , IraqCONTRACT Time LINE
: 2021Brief Scope of Work (SOW): Raw water pipeline in SIBA FIELD DEVELOPMENT PROJECT. Raw water length (3765M) supply pipeline , delivering water from the raw water Intake station at the shat al-arab river to the CPF. Static Equipment Installation Rotary Equipment Installation Piping Installation Construcation Civil Mechanical Electrical Instrument Supports NDT Hydro-Test Sandblast Painting Flushing Pre Commissioning
Owner
: kuwait Energy Iraq LimitedClient
: Pertojet Co.Sub-Project
:Location
: Siba , IraqCONTRACT Time LINE
: 2017Brief Scope of work (SOW): - Install the 3 new pipelines 30, 16”, 24” from the hammar mishrif (DGS) North to hammar mishrif (BGC) pipeline is of 7000m long. Piping Installation Construcation Civil Mechanical Electrical Instrument Supports NDT Hydro-Test Sandblast Painting Flushing Pre Commissioning CP system
Owner
: Basra Gas Company (BGC)Client
: Pertojet Co.Sub-Project
:Location
: Hammar Mishrif , Basra , IraqCONTRACT Time LINE
: 2017